Accessory Dwelling Units (ADUs)

This page provides a brief overview of accessory dwelling units (ADUs) for cities and counties in Washington State, including legal requirements and examples of city and county codes.


What is an Accessory Dwelling Unit?

An accessory dwelling unit (ADU) is a small, self-contained residential unit located on the same lot as an existing single-family home.

An ADU has all the basic facilities needed for day-to-day living independent of the main home, such as a kitchen, sleeping area, and a bathroom. As the term "accessory" implies, ADUs are generally defined to be smaller in size and prominence than the main residence on the lot. Some definitions include specific size limits, and a location that is not readily visible from the street.

In theory, an ADU may be created as a separate unit within an existing home (such as in an attic or basement), an addition to the home (such as a separate apartment unit with separate entrance), or in a separate structure on the lot (such as a converted garage). See the examples shown below.

Some communities, however, only allow ADUs that are within or attached to the main residence, and exclude ADUs housed in a separate structure. Whether attached or detached from the main residence, most codes require that the main residence and the ADU must be owned by the same person and may not be sold separately.

ADUs are sometimes called "mother-in-law apartments" or "granny flats," because they are often used to house extended family. Other codes use terms such as "accessory apartment," "accessory living unit," or "secondary unit," to have a similar meaning.

Sketch image of attached ADUs compared to detached ADUs

Statutory Requirements for ADUs in Washington State

State law (RCW 36.70A.680 and 36.70A.681) requires all local governments planning under the Growth Management Act (GMA), regardless of population and including counties (unincorporated urban growth areas) as well as cities, to revise their regulations as needed to conform, within six months after their periodic update due date, with the following requirements:

  • Minimum number of ADUs per lot: Two ADUs per lot must be allowed in all GMA urban growth areas, in addition to the principal unit, for lots that meet the minimum lot size required for the principal housing unit. Local regulations must permit ADUs to be attached, detached or a combination of both types. In addition, a conversion of an existing structure, such as a detached garage, must be allowed.
  • Maximum ADU size standard: Local governments may not require ADUs to be smaller than 1,000 gross square feet in size.
  • Dimensional standards: A local government may not impose setback requirements, yard coverage limits, tree retention mandates, or restrictions on entry door location that are more restrictive than those required for the principal unit.
  • Street improvements: A local government may not require street improvements as a condition of permitting accessory dwelling units.
  • Owner occupancy: A local government may not require owner occupancy for a principal unit or ADUs.
  • Condominium sales: Local governments may not prohibit the sale or other conveyance of a condominium unit independently of a principal unit solely on the grounds that the condominium unit was originally built as an ADU.
  • Design review: Local governments may not impose aesthetic standards or requirements for design review that are more restrictive for ADUs than those for principal units.
  • Required parking: There are restrictions on how much on-site parking can be required, with a sliding scale for smaller-sized lots. No on-site parking standards may be applied to ADUs located within a half-mile of a major transit stop.
  • Impact fees: Impact fees for ADUs are limited to no more than 50% of those assessed to the principal housing unit.
  • Common Interest Communities: New “Common Interest Communities” (for example, a new subdivision with a homeowners association) are prohibited from adopting covenants, conditions, and restrictions (commonly called “CC&Rs”) that would limit the construction of ADUs on any lot. Existing CC&Rs, however, are not impacted by the new law and may remain in effect.

Examples of Local ADU Codes

The table below provides examples of accessory dwelling unit codes adopted by cities and counties in Washington State, including a basic comparison of their provisions. (Click on the image to see a larger version.)

Most of these examples allow for both attached ADUs (sometimes called AADUs) and detached ADUs (sometimes called DADUs). With the exception of Vancouver, each requires that one of the units be occupied by the owner of the property. Many of the provisions limit the size of the accessory unit, ranging from 600 to 1,000 square feet. Some also limit the size of the accessory unit relative to the primary unit, ranging from 40% to 75% of the area of the primary unit.

Almost all of the code provisions rely on the development regulations of the underlying zones. Several provide maximum heights, onsite-parking, setbacks and other requirements specific to ADUs. Additionally, many of code provisions require the ADU to be similar in design to the primary unit (which may or may not be desirable, depending upon the design of the primary residence).

Washington State

Click on the table below to view a summary analysis of selected ADU provisions from cities in Washington State, including links to the actual code provisions.

Preview image of downloadable table showing selected ADU provisions

Out-of-State


Reducing Zoning and Permitting Barriers for ADUs

A few Washington State cities have or are re-examining some of the standards listed above to determine if they are acting as barriers to the construction of new ADUs. As may be seen in the out-of-state examples above, some cities such as Portland (OR), Santa Cruz (CA), and Vancouver (BC) have changed some of their requirements, such as eliminating owner occupancy, in order to encourage the production of more ADUs. In addition to the examples of Seattle and Vancouver (WA), cities such as Ferndale and Yakima do not require owner occupancy. Another innovative approach is Seattle’s program to streamline its ADU permitting process by providing pre-approved ADU plans. Some cities, such as Port Angeles, are addressing cost barriers by eliminating requirements for ADUs to have separate utility connections and, instead, allowing ADUs to be connected to the primary dwelling unit for sewer and water services. Other cities, such as Spokane, have eliminated minimum lot size requirements and expanded the maximum ADU size permitted.

The preliminary results appear to show that the reduced zoning requirements have resulted in more ADUs in these cities. For example, since adopting its ADU program in 2009, Vancouver (BC) has permitted over 3,000 ADUs and has set the target of adding another 4,000 by 2028. Recent regulatory reform, fee waivers, and public education efforts in Portland have contributed to the doubling of the number of annual ADUs permits, from under 300 in 2014 to an average of over 600 per year from 2016-2018 (see AccessoryDwellings.org's page on ADU Permit Trends in Portland in 2017 and 2018).

Examples


Fee Reductions/Waivers for ADUs

Homeowners seeking to develop an ADU on their property face several financial hurdles, such as impact fees, permitting fees, utility connection costs, and increased property taxes in addition to labor and materials costs associated with the actual construction of an ADU. Some local governments are seeking to directly reduce cost-burdens and incentivize ADU development. For example, cities such as Spokane and Port Angeles, are temporarily waving building permit and other fees associated with ADU construction. Another approach to reducing costs is Spokane’s policy providing property tax exemptions for newly constructed ADUs.

Outside of Washington State, other local governments are also experimenting with incentives for ADU construction. For example, Portland (OR) waives “system development charges” (i.e., impact fees) for proposed ADUs with a 10-year commitment from the property owner that the ADU will be used as long-term housing, as opposed to used as a short-term rental (see Portland's page, Apply for an ADU System Development Charge Waiver). Portland also provides an ADU Financing Guide that identifies local financial institutions with programs that can be used to fund ADU construction. Other local governments, such as Marin County (CA), will waive permit fees between $2,500 and $10,000 based on the rates at which the ADU will be rented, ranging from market-rate to at or below 80% area median income. See Marin County's page on ADU Resources.

Examples


Short-Term Rental of ADUs and Enforcement

In recent years, ADUs have been increasingly used as short-term rentals (STRs) on online platforms such as Airbnb and VRBO. This use of ADUs, and other types of would-be affordable housing, has a negative impact on the affordable housing supply in cities (see MRSC's blog post on Affordable Housing and the Impact of Short-Term Rentals). Some cities, such as Poulsbo, do not permit the use of ADUs as STRs. Others, such as Langley, limit the amount of STR permits approved for ADUs.

Enforcing these STR regulations is challenging--it is very difficult for cities to determine how many or which ADUs are being offered as STRs on online rental platforms. As such, technology is playing a growing role in local enforcement of STR rules. Many cities across the U.S., including Madison (WI) and Charleston (SC), are starting to use 3rd party technology companies to monitor and report on STRs. Portland (OR) is in the process of developing its own data analyzing and enforcement software (see Portland's page on Short-Term Rental Regulation). Some large cities, such as Seattle and Los Angeles (CA), have had the benefit of collaborating with Airbnb on enforcement (see Los Angeles Magazine article (2020)). Despite these techniques, the enforcement of STR regulations remains a significant challenge for local governments of all sizes.